STEPS OF STRUCTURAL WORK FOR A PROJECT ON CONSTRUCTION

PROCESS OR STEPS OF STRUCTURAL WORK

As civil engineer its very important to know about basic parts of engineering knowledge. now i will discus about sequence or steps of structural work at construction site.

 

1.1    HERE ARE THE STEPS OF CONSTRUCTION WORK

1st Step:           Site  mobilization
2nd Step:        Land survey and underground soil test ( Bearing capacity calculation)
3rd Step:          Finalize Architectural, Structural, plumbing and Electrical design.
4th Step:          Have to provide layout and level of the structure.
5th Step:          Earth work and piling (if needed)
6th Step:          Bellow foundation sand soling, brick soling concrete soling have to provide according to  

                     requirement.
7th Step:          Steel bar bendingand frame making for foundation and column according to design.
8th Step:          Foundation casting
9th Step:          Column casting
10th Step:      Beam and slab casting
11th Step:      Have to provide brick layout on the floor. 
12th Step:        Brick masonry work. 

1.2        BEAUTIFICATION AND FINISHING WORK

1st Step:           Door frames fitting.

2nd Step:        Windows framesfitting

3rd Step:          Sanitary work for all portion of the building.

4th Step:          Electric switchboard fitting

5th Step:          Inside and outside plastering

6th Step:          Thi-aluminium windows and doors fittings.

7th Step:          Electric works.

8th Step:          Tiles work.

9th Step:          First coat colour on the ceiling (with seal or putting).

10th Step:      First coat colour on inside and outside wall (with seal or putting).

11th Step:      Tiles pointing

12th Step:      Wood varnish and final colouring. 
 
 
 